Renovation of the Chorągwica Health Centre

Renovation works in the health centre in Chorągwica are under way. The Wieliczka Municipality has allotted over 220 thousand PLN to this cause.

The new arrangement of the premises along with the exchange of the severage and electric instalations as well as the central heating shall be performed in the premises with the total utility space of 170 m2.

In 20 days' time already, the residents of the town shall be able to access the modernised institution.

This does not mean that presently the health centre is inaccessible, beacuse - as the renovation works executors ensure - the places where the works are being performed have been covered with foil and marked according to the industrial safety regulations.

The main contractor is the Kulmbud firm from Słomiany near Wieliczka.

The renovation works are drawing to an end - the partitions have been made already, similarly as the ceiling frame. Plaster shortages have been filled in, new electric instalation has been installed and the windows were changed.

In the nearest future floor made of anti-slide gres tiles shall be laid down and the sanitary premises shall be revitalised .

The contractor assures the works are being performed dynamically and that at the end of September already the centre shall get a brand new look.

Tagi